greenhouse services - service includes: 1.- perimeter fence: construction of a fence 140 meters long with impregnated posts 3 to 4" in 240 mt, 2.- fabrication and installation of a wooden two-leaf gate 2.3 meters long by 1.8 meters high, 3.- digging to a depth of 60 centimeters for installation of 20 posts (see terms of reference) (UNSPSC 70111602)
Data updated 2026-09-11 (UTC)Benchmark computed 2026-10-21 (UTC)Publisher’s own words: Servicios de invernaderoEl Servicio corresponde a: 1.- Cerco perimetral: Consiste en construir un cerco en una longitud de 140 metros eposte impregando de 3 a 4" en 240 mt , 2.- Confeccionar e instalar un portón de madera de dos hojas de 2.3 metros de largo por 1.8 metros de alto, 3.- holladura de una profundidad de 60 centímetros para la instalación de 20 postes (Ver Terminos de referencias)
All records — every source, converted
Every record for this item, from all sources together, converted to US dollars. The minimum, median and maximum below are calculated across all sources and are descriptive of these records. They are not the benchmark — the benchmark is computed per currency and shown below. Why both exist.
Price distribution
22 records shown. 0 removed as outliers (0 below $0.00, 0 above $24,930,688.33).
Price over time
Same records and same outlier rule as the chart above.
How order size relates to unit price
Not enough records to show how order size relates to price. The unit with the most records, EA, has 7 with a quantity other than 1, from 1 tenders. The chart needs at least 20 such records from at least 5 tenders, with order sizes at least 10× apart.
Benchmark — per currency
CLPper lot
Median $6,835.43IQR $1,400.21–$29,097.71Converted — derived
6 of 6 records carry a dollar figure. Publisher’s own median CLP 6,463,915 · IQR CLP 1,314,800–CLP 27,322,754.
6 competitive-award records from 6 contracting processes · tax excluded · median from 6 of 6 records
CLPper unit
No benchmark4 eligible records. A median is not computed from fewer than 5, so none is shown.
Source records
22 records — every price links back to its source contracting process.
An OCID (Open Contracting ID) is the permanent identifier the publisher gives to one contracting process — a single tender, from notice through to award. It is how a figure on this site is traced back to the public record behind it. Rows sharing an OCID come from the same tender, not from separate purchases. More on what an OCID identifies →
| OCID (Open Contracting ID) | Publisher | Date | Unit price (USD)converted | Published pricepublisher’s currency | Quantity | Method | Price basis | Source record link |
|---|---|---|---|---|---|---|---|---|
| ocds-70d2nz-3887-13-LE26 | Chile | 2026-04 | $141.92 | CLP 127,806 | 1Unidad | PublishedNot averaged | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-3887-13-LE26 (opens in a new tab) |
| ocds-70d2nz-3947-55-LE25 | Chile | 2025-12 | $4,555.15 | CLP 4,165,000 | 1Unidad | PublishedNot averaged | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-3947-55-LE25 (opens in a new tab) |
| ocds-70d2nz-2766-130-L125 | Chile | 2025-12 | $3,780.39 | CLP 3,522,000 | 1Global | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-2766-130-L125 (opens in a new tab) |
| ocds-70d2nz-2453-968-TD25 | Chile | 2025-09 | $6.97 | CLP 6,674 | 10EA | Publishednot competitive | Tax excludedScope unknownDelivery terms unknown | Award summary (publisher's page) for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) Publisher's record page for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) |
| ocds-70d2nz-2453-968-TD25 | Chile | 2025-09 | $10.28 | CLP 9,842 | 8EA | Publishednot competitive | Tax excludedScope unknownDelivery terms unknown | Award summary (publisher's page) for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) Publisher's record page for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) |
| ocds-70d2nz-2453-968-TD25 | Chile | 2025-09 | $12.35 | CLP 11,821 | 4EA | Publishednot competitive | Tax excludedScope unknownDelivery terms unknown | Award summary (publisher's page) for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) Publisher's record page for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) |
| ocds-70d2nz-2453-968-TD25 | Chile | 2025-09 | $7.88 | CLP 7,538 | 10EA | Publishednot competitive | Tax excludedScope unknownDelivery terms unknown | Award summary (publisher's page) for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) Publisher's record page for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) |
| ocds-70d2nz-2453-968-TD25 | Chile | 2025-09 | $4.07 | CLP 3,896 | 12EA | Publishednot competitive | Tax excludedScope unknownDelivery terms unknown | Award summary (publisher's page) for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) Publisher's record page for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) |
| ocds-70d2nz-2453-968-TD25 | Chile | 2025-09 | $7.28 | CLP 6,971 | 4EA | Publishednot competitive | Tax excludedScope unknownDelivery terms unknown | Award summary (publisher's page) for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) Publisher's record page for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) |
| ocds-70d2nz-2453-968-TD25 | Chile | 2025-09 | $18.00 | CLP 17,224 | 4EA | Publishednot competitive | Tax excludedScope unknownDelivery terms unknown | Award summary (publisher's page) for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) Publisher's record page for record ocds-70d2nz-2453-968-TD25 (opens in a new tab) |
| ocds-70d2nz-4020-43-LE25 | Chile | 2025-08 | $9,890.46 | CLP 9,405,830 | 1Global | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-4020-43-LE25 (opens in a new tab) |
| ocds-70d2nz-1126-14-LP25 | Chile | 2025-08 | $1,944.00 | CLP 1,848,740 | 14Unidad | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-1126-14-LP25 (opens in a new tab) |
| ocds-70d2nz-1126-14-LP25 | Chile | 2025-08 | $1,944.00 | CLP 1,848,740 | 26Unidad | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-1126-14-LP25 (opens in a new tab) |
| ocds-70d2nz-5968-2-LE25 | Chile | 2025-08 | $8,461.70 | CLP 8,284,000 | 1Unidad | PublishedNot averaged | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-5968-2-LE25 (opens in a new tab) |
| ocds-70d2nz-4170-33-LE25 | Chile | 2025-07 | $1,333.33 | CLP 1,240,000 | 1Global | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-4170-33-LE25 (opens in a new tab) |
| ocds-70d2nz-5952-1-LE25 | Chile | 2025-06 | $29,097.71 | CLP 27,322,754 | 1Global | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-5952-1-LE25 (opens in a new tab) |
| ocds-70d2nz-5952-11-LP24 | Chile | 2025-06 | $65,329.45 | CLP 61,344,357 | 1Global | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-5952-11-LP24 (opens in a new tab) |
| ocds-70d2nz-1058339-4-LE25 | Chile | 2025-06 | $1,400.21 | CLP 1,314,800 | 1Global | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-1058339-4-LE25 (opens in a new tab) |
| ocds-70d2nz-1420-23-AG25 | Chile | 2025-05 | $469.08 | CLP 440,000 | 1EA | Publishednot competitive | Tax excludedScope unknownDelivery terms unknown | Award summary (publisher's page) for record ocds-70d2nz-1420-23-AG25 (opens in a new tab) Publisher's record page for record ocds-70d2nz-1420-23-AG25 (opens in a new tab) |
| ocds-70d2nz-1126-5-LP25 | Chile | 2025-04 | $1,822.08 | CLP 1,700,000 | 14Unidad | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-1126-5-LP25 (opens in a new tab) |
| ocds-70d2nz-1126-5-LP25 | Chile | 2025-04 | $1,822.08 | CLP 1,700,000 | 26Unidad | Published | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-1126-5-LP25 (opens in a new tab) |
| ocds-70d2nz-4020-103-LE24 | Chile | 2025-01 | $8,276.55 | CLP 8,226,891 | 1Unidad | PublishedNot averaged | Tax excludedScope unknownDelivery terms unknown | Publisher's record page for record ocds-70d2nz-4020-103-LE24 (opens in a new tab) |
Published — the publisher gave a unit price. Derived — we divided the line total by the quantity; how prices are derived. Not averaged — the record is shown but kept out of the benchmark, because the amount is a line total rather than a unit price, or the unit names a category rather than a measure; what is counted. Units are the publisher’s own and are not normalised.
Market ReferenceMarket reference
No cached market reference for this item.
Request market research →