← Back to browse

Viajes en aviones comerciales (UNSPSC 78111502)

Updated 2026-09-10
Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)Chile — Dirección de Compras y Contratación Pública (ChileCompra / Mercado Público)Dominican Republic — Dirección General de Contrataciones Públicas (DGCP / Portal Transaccional)
Published/DerivedAI-Assisted — EstimatedMarket Reference

Benchmark

CLP

No benchmark
Tax excluded

12 eligible records — enough to compute a median, but this item has not been through a benchmark run yet. A figure will appear once the next run includes it.

DOP

No benchmark
Tax excluded

114 eligible records — enough to compute a median, but this item has not been through a benchmark run yet. A figure will appear once the next run includes it.

HNL

No benchmark
Tax included

161 eligible records — enough to compute a median, but this item has not been through a benchmark run yet. A figure will appear once the next run includes it.

USD

No benchmark
Tax excluded

21 records exist for this currency and tax basis, and none are eligible for a benchmark: 18 Non-competitive award — excluded by the benchmark's filter, not flagged on this record; 3 Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averaged.

Source records

2454 records — every price links back to its source contracting process.

An OCID (Open Contracting ID) is the permanent identifier the publisher gives to one contracting process — a single tender, from notice through to award. It is how a figure on this site is traced back to the public record behind it. Rows sharing an OCID come from the same tender, not from separate purchases. More on what an OCID identifies →

Tier-1 published and derived unit prices for this classification, one row per source contracting process.
OCID (Open Contracting ID)PublisherUnit priceMethodCompetitivePrice basisSource record link
ocds-lcuori-0rwMYG-CM-SE-UCP-BM-004-2025 -1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 103,500.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-0rwMYG-CM-SE-UCP-BM-004-2025 -1 (opens in a new tab) Does not show this record
ocds-lcuori-0rwMYG-CM-SE-UCP-BM-009-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 33,142.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-0rwMYG-CM-SE-UCP-BM-009-2025-1 (opens in a new tab)
ocds-lcuori-0rwMYG-CM-SE-UCP-BM-010-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 220,458.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-0rwMYG-CM-SE-UCP-BM-010-2025-1 (opens in a new tab)
ocds-lcuori-0rwMYG-CM-SE-UCP-BM-019-2025 -1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 25,595.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-0rwMYG-CM-SE-UCP-BM-019-2025 -1 (opens in a new tab) Does not show this record
ocds-lcuori-0rwMYG-HN-SE-484282-NC-RFQ-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 742,400.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-0rwMYG-HN-SE-484282-NC-RFQ-1 (opens in a new tab) Does not show this record
ocds-lcuori-0rwpbL-UNAH-SEAF-CM-GV-07-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 17,690.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-0rwpbL-UNAH-SEAF-CM-GV-07-2025-1 (opens in a new tab)
ocds-lcuori-0rwpbL-UNAH-SEAF-CM-GV-17-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 149,850.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-0rwpbL-UNAH-SEAF-CM-GV-17-2025-1 (opens in a new tab)
ocds-lcuori-0rwpbL-UNAH-SEAF-CM-GV-27-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 82,629.80Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-0rwpbL-UNAH-SEAF-CM-GV-27-2025-1 (opens in a new tab)
ocds-lcuori-1RaeMR-CM-SEDESOL-GC-002-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 13,800.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-1RaeMR-CM-SEDESOL-GC-002-2025-1 (opens in a new tab)
ocds-lcuori-1RaeMR-CM-SEDESOL-GC-011-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 17,700.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-1RaeMR-CM-SEDESOL-GC-011-2025-1 (opens in a new tab)
ocds-lcuori-1RaeMR-CM-SEDESOL-GC-014-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 17,700.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-1RaeMR-CM-SEDESOL-GC-014-2025-1 (opens in a new tab)
ocds-lcuori-1RaeMR-CM-SEDESOL-GC-015-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 17,700.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-1RaeMR-CM-SEDESOL-GC-015-2025-1 (opens in a new tab)
ocds-lcuori-1RaeMR-CM-SEDESOL-GC-016-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 17,700.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-1RaeMR-CM-SEDESOL-GC-016-2025-1 (opens in a new tab)
ocds-lcuori-1RaeMR-CM-SEDESOL-GC-020-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 15,450.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-1RaeMR-CM-SEDESOL-GC-020-2025-1 (opens in a new tab)
ocds-lcuori-1RaeMR-CM-SEDESOL-GC-021-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 8,200.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-1RaeMR-CM-SEDESOL-GC-021-2025-1 (opens in a new tab)
ocds-lcuori-1RaeMR-CM-SEDESOL-GC-022-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 19,000.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-1RaeMR-CM-SEDESOL-GC-022-2025-1 (opens in a new tab)
ocds-lcuori-1RaNer-CM-623-ANSEC-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 49,439.20Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-1RaNer-CM-623-ANSEC-2025-1 (opens in a new tab)
ocds-lcuori-2LmKVR-CM-001-INAMI-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 64,875.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-2LmKVR-CM-001-INAMI-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-2LmN0G-CM-SEDESPA-GC-037-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 28,890.64Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-2LmN0G-CM-SEDESPA-GC-037-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-2LmN0G-CM-SEDESPA-GC-051-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 12,098.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-2LmN0G-CM-SEDESPA-GC-051-2025-1 (opens in a new tab)
ocds-lcuori-2LmN0G-CM-SEDESPA-GC-057-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 6,061.40Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-2LmN0G-CM-SEDESPA-GC-057-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-2LmN0G-CM-SEDESPA-GC-070-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 7,279.04Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-2LmN0G-CM-SEDESPA-GC-070-2025-1 (opens in a new tab)
ocds-lcuori-2LmN0G-CM-SEDESPA-GC-076-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 7,142.80Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-2LmN0G-CM-SEDESPA-GC-076-2025-1 (opens in a new tab)
ocds-lcuori-4LOBkr-UNAH-DSEP-003-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 14,145.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-4LOBkr-UNAH-DSEP-003-2025-1 (opens in a new tab)
ocds-lcuori-4LOBkr-UNAH-DSEP-004-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 11,145.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-4LOBkr-UNAH-DSEP-004-2025-1 (opens in a new tab)
ocds-lcuori-7G3aVr-CM-AEA-DID-05-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 37,798.36Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7G3aVr-CM-AEA-DID-05-2025-1 (opens in a new tab)
ocds-lcuori-7G3MNr-CM-HR-02-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 153,036.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7G3MNr-CM-HR-02-2025-1 (opens in a new tab)
ocds-lcuori-7GX4eG-CM-INE-FN-042-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 18,334.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GX4eG-CM-INE-FN-042-2025-1 (opens in a new tab)
ocds-lcuori-7GX4eG-CM-INE-FN-045-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 38,640.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GX4eG-CM-INE-FN-045-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CM-081-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 63,444.98Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CM-081-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-001-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 33,120.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-001-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-038-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 34,330.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-038-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-044-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 50,557.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-044-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-056-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 33,563.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-056-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-072-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 41,610.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-072-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-076-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 45,560.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-076-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-077-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 44,095.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-077-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-078-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 55,290.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-078-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-083-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 66,240.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-083-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXa9R-CMA-084-UDH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 83,760.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXa9R-CMA-084-UDH-2025-1 (opens in a new tab)
ocds-lcuori-7GXBPr-UNAH-FI-CM-GV-001-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 31,313.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-7GXBPr-UNAH-FI-CM-GV-001-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-7GXBPr-UNAH-FI-CM-GV-012-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 27,703.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownSigned contract (PDF) for record ocds-lcuori-7GXBPr-UNAH-FI-CM-GV-012-2025-1 (opens in a new tab)
ocds-lcuori-7GXeeR-SPE-CM-100-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 36,242.66Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-7GXeeR-SPE-CM-100-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-7GXeeR-SPE-CM-378-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 19,194.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-7GXeeR-SPE-CM-378-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-7GXeeR-SPE-CM-99-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 62,694.60Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-7GXeeR-SPE-CM-99-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-7rB9pR-CM-161-SECAPPH-PICCCMAH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 4,500.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-7rB9pR-CM-161-SECAPPH-PICCCMAH-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-7rB9pR-CM-166-SECAPPH-PICCCMAH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 12,700.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-7rB9pR-CM-166-SECAPPH-PICCCMAH-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-7rB9pR-CM-172-SECAPPH-PICCCMAH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 50,800.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-7rB9pR-CM-172-SECAPPH-PICCCMAH-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-7rB9pR-CM-174-SECAPPH-PICCCMAH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 45,891.20Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-7rB9pR-CM-174-SECAPPH-PICCCMAH-2025-1 (opens in a new tab) Does not show this record
ocds-lcuori-7rB9pR-CM-209-SECAPPH-PICCCMAH-2025-1Honduras — Oficina Normativa de Contratación y Adquisiciones del Estado (ONCAE)HNL 163,350.00Published · Line total, not a unit price — no unit given and quantity 1, so the per-unit basis was never established; shown but not averagedYesTax includedNationalDelivery terms unknownPublisher's system — no record page published for record ocds-lcuori-7rB9pR-CM-209-SECAPPH-PICCCMAH-2025-1 (opens in a new tab) Does not show this record

Market ReferenceMarket reference

No cached market reference for this item yet.

Request market research →